Egress Window Cutting in Bismarck, ND
Cutting a code-sized opening in a poured or block foundation is the part homeowners shouldn't DIY. A wet-cut system keeps the mess down and the opening square — sized to the 5.7 sq ft ND requirement the first time.
Why cutting is the step to hire out
TODO: rebar, headers, structural load on bearing walls, drainage planning.
Poured vs. block foundations
TODO.